Linoleum Floor Adhesive

Water-based Linoleum Flooring Adhesive

B890
Delivery:
EXW/FOB
minimum order:
1 barrel
Supply Ability:
30barrel / Day
Country of Origin:
China
Stock Time:
20Day
25kg/barrel
Quantity:
Contact Now
B890 Water-based Linoleum Flooring Adhesive
B890 linoleum flooring adhesive is mainly suitable for bonding various environmentally friendly linen and cork floor rolls, sheets, fabric-lined floors and absorbent base layers in civil, commercial and some industrial buildings.
Key Features:
Self adhesive flooring has stable quality, good water resistance, excellent adhesion, and extremely high initial and final adhesion strength
Elastic bonding, long-lasting and effective, ensuring stable and long-term performance of floor materials
Convenient construction, easy laying, and large coating area
Non-toxic and harmless, green and environmentally friendly
 
 
ColorCream
Appearance :
Colloid is uniform, without agglomerates
 Adhesion strength :
≥0.30Mpa
Waiting time :
About 0-5 minutes (depending on the weather)
 Actual drying time:
About 72 hours
Theoretical dosage:B1 tooth scraper: 350-400g/m2
Colloid temperature stability0~50℃
Water-based Linoleum Flooring Adhesive
           

Construction Method:
  • Stir the linoleum flooring adhesive thoroughly before use.
  • It is recommended to use the B1 serrated scraper to evenly apply the glue. After spreading, let the glue dry for 0-20 minutes, and then lay the above floor materials.
  • After laying the floor, first use a cork board and then a roller of more than 50KG to roll it to remove the residual air and ensure that the adhesive is fully bonded to the back of the floor.
  • For floors with special requirements, follow the instructions provided by the flooring company.
  • It is basically cured after 24 hours and can be walked on after 48 hours.
Precautions
  • This linoleum flooring adhesivet should be protected from high temperature and sunlight during transportation, storage and construction. The storage room temperature should be above 0 degrees Celsius in winter.
  • The construction temperature should not be lower than 5℃.
  • When the temperature is low and the relative air humidity is high, heating and ventilation measures should be taken on site.

Send Message